AOT Road Construction Report, Week of August 23

AOT Road Construction Report

Week of August 23, 2021

This weekly report is a list of planned construction activities that will have traffic impacts on state highways throughout Vermont. Please remember to drive safely in all work zones. Lives depend on it.

Interstates

I-89 Berlin – The bridge deck replacement project continues. Lane and speed reductions are in place in each direction; crossovers are being utilized. Motorists should expect flagged traffic on Crosstown Road and VT 62 throughout the week. Minor delays may result.

I-89 Hartford Sharon – A resurfacing project continues. Operations will require lane reductions in the vicinity of active construction. A speed reduction to 55 mph will be enforced when lane closures are in effect. Work will occur both day and night this week.

I-89 Sharon – A bridge rehabilitation project is underway. Traffic is reduced to one lane in each direction; crossovers are being utilized. Motorists: be aware of a work zone speed reduction.

I-89 White River Junction – Our partners at NHDOT are working on a multi-year bridge replacement project on I-89 over the Connecticut River. Motorists should expect lane and speed reductions over the bridge.

I-91 Hartford – Motorists will encounter continuous lane closures on I-91 in both directions between Exits 12 and 11 as crews continue bridge repair operations.

I-91 Rockingham –The bridge replacement project continues. Both northbound and southbound travel lanes are open to traffic. Expect narrow lanes; please use caution.

I-91 Weathersfield – A bridge deck replacement project continues at Exit 8. Lane and speed reductions are in effect in each direction as southbound traffic is merged to the northbound bridge using a crossover. Flagged traffic on VT 131 through the week may cause some delays.

Around the State

Berkshire – A culvert replacement project continues along VT 118 just north of its intersection with VT 105. A detour around the project site remains in place.

Burlington – Work on the Shelburne Street Roundabout project is underway. A new traffic pattern is in place along U.S. 7 (Shelburne St) between Flynn Ave and the intersections with St. Paul Street/Union Street and Beech Street. U.S. 7 northbound traffic will remain reduced to one lane beginning at Flynn Ave.

Motorists should expect lane closures and one-way traffic (eastbound) on Locust Street, Monday through Friday, 6:30 a.m. to 5:30 p.m. Gove Court will be closed to non-residents.

Burlington Waterfront - The AMTRAK/Greenway project continues. A long-term closure to vehicular traffic at the waterfront rail crossing is in effect. The road will reopen to vehicular traffic on Friday, 9/17. Bike and pedestrian access will be maintained.

Calais – A bridge replacement project is underway along VT 14 just south of its intersection with Pekin Brook Road. Motorists will encounter one-way alternating traffic controlled by flaggers during the day, with a traffic light at the bridge during off hours. Expect some delays.

Cavendish – Weathersfield – A roadway reclaim project progresses along VT 131. Motorists should expect alternating one-way traffic in the vicinity of multiple operations. Plan on delays.

Chelsea – Thetford – A resurfacing project continues along VT 113. Motorists will encounter grooved pavement, loose gravel, and limited pavement markings throughout the project limits. Plan on delays.

Chester – Springfield – Multiple bridge replacement projects are underway on VT 11 between VT 103 in Chester and VT 106 in Springfield. Expect one-way alternating traffic at multiple points along this route, with minor delays in several locations.

Colchester – Essex – Expect lane closures along VT 15 near its intersections Lime Kiln Road and National Guard Road from 10:00 a.m. to 3:00 p.m. throughout the week for the multi-use path project. Pedestrians should follow a signed detour.

Enosburgh – Motorists are now traveling over the new bridge along VT 118. Be aware of truck traffic moving in/out of the area as crews continue removing the temporary detour.

Essex – Expect one-way alternating traffic along VT 117 at its intersection with VT 289 from 8:30 a.m. to 4:30 p.m. on Monday and Tuesday. Plan on delays. Two-way traffic with lane shifts will then be in place for the rest of the week.

The westbound VT 289 on-ramp remains closed; motorists will be shifted to the VT 289 eastbound ramp. Please be aware of speed reductions and construction vehicles moving in/out of the project area.

Fair Haven – Rutland – Expect single-lane closures in multiple locations on U.S. 4 in both directions this week for roadway improvement operations.

Fayston – A paving project is underway along VT 17. Motorists will encounter areas of one-way alternating traffic as crews work on guardrail and milling operations.

Groton – Newbury – Motorists should expect alternating one-way traffic on U.S. 302 with possible delays as crews continue paving, ditching operations, and installing signage and guardrail.

Hartford – Motorists should expect lane closures and intermittent alternating one-way traffic on U.S. 4 and VT 14 as crews work on signal systems and adjust drain inlets and sewer manholes.

Motorists can also expect lane closures along Sykes Mountain Avenue and U.S. 5 as work continues on the roundabout and sidewalk project. Minimal delays.

Hartland – A bridge deck replacement project begins along VT 12 over Lulls Brook. Motorists should expect flagged traffic with some delays in the area on Monday, 08/23 as crews install temporary signals.

Johnson – A slope remediation project continues along VT 15 this week. Motorists should expect one-way alternating traffic with minimal delays in the project area.

Johnson Morristown – Motorists should expect traffic delays and areas of gravel roadway on VT 15 and VT 15A as crews place gravel and work on underdrain.

Londonderry – Chester – Topsoil and erosion repair and sign installation along VT 11 continues. There will be alternating one-way flagged traffic in multiple areas, causing delays.

Middlebury – Travelers can expect alternating lanes of travel during evening construction hours on VT 125, VT 30, and U.S. 7 for paving operations.

Nighttime paving for the Bridge & Rail project this week starting at 7:00 p..m. on Monday, 08/23. Paving will begin in the Marble Works, with flaggers managing traffic. Merchants Row will then be closed to motorists, and Main Street will be limited to alternating one-lane traffic. Please plan accordingly.

Newbury – A bridge replacement project is underway just north of the junction of Boltonville Rd. and U.S. 302. A full closure at the location of the bridge is in place; a local signed detour is in effect. The bridge will reopen in October.

North Hero – Grand Isle – Drawbridge construction continues along U.S. 2 - day and night. A speed reduction remains in place. Mariners: the drawbridge will open at the top of the hour between 8:00 a.m. and 8:00 p.m. each day. To request an opening or to communicate with the bridge tender, please use Channel 13 or call 802-372-4360.

Pittsford – Multiple roadway reconstruction activities on U.S. 7. Motorists should proceed with caution as they navigate new traffic patterns and lane shifts throughout the project. A speed reduction to 35 mph remains in effect.

Plymouth – A culvert replacement and roadway improvement project begins along VT 100. Motorists will encounter lane closures with flaggers managing alternating traffic.

Plymouth – Bridgewater – Expect one-way alternating traffic with some delays along VT 100A for milling and guardrail work. Motorists will encounter flaggers and Automated Flagger Assistance Devices (AFADs)

Proctor – North Street remains closed to through-traffic at the location of the bridge project over the Vermont Railway until October 2021. A signed detour is in place.

Richford – Jay – Motorists should expect one lane of alternating traffic along VT 105 in multiple locations, resulting in delays.

Rockingham – Our partners at NHDOT are working on a rehabilitation project on the Church Street Bridge connecting Vermont and New Hampshire. Motorists should expect intermittent, alternating one-way traffic and some delays.

Springfield – A roadway resurfacing project is underway along VT 106 and VT 10. Paving on VT 10 between VT 106 and VT 103 will cause delays. Expect one-way alternating traffic in various locations along this route.

Williston – Due to the closure of Muddy Brook Bridge on Kimball/Marshall Avenue, motorists on U.S. 2 will see an increase in traffic interruptions and should expect extended delays during peak commute hours in the morning and evening. Plan for extra travel time through the area.

Motorists will also encounter a temporary detour with lane shifts along U.S. 2 near its intersection with Industrial Avenue.

Winooski – A concrete slab rehabilitation project continues along U.S. 7 and West Allen St. (the Winooski Circulator). Work is scheduled for Sunday night through Thursday night (08/22-08/26). Expect lane closures from 7:00 p.m. to 6:00 a.m.

Woodford – A ledge stabilization project is underway on VT 9. Eastbound traffic is reduced to one lane; a lane shift for westbound traffic will be in place through November. A traffic hold is planned for Tuesday, 08/24 and Thursday, 08/26 from 9:00 a.m. to 11:00 a.m. for blasting operations. Delays will occur.