Vermont Business Magazine The following are Public Alerts submitted by Wastewater Treatment Facilities for prompt public awareness of untreated discharges and their locations. A new incident has been reported (or existing incident has been modified) for Rutland Wastewater Treatment Facility in City of Rutland as of Wednesday morning. These alerts have been directly reported by Wastewater Treatment Facilities and may have not yet been reviewed by the State. Wastewater Treatment facilities are required to submit a public alert as soon as possible, but no longer than one hour from discovery of an untreated discharge from the wastewater treatment facility. This time requirement is extended to no longer than four hours if the operator does not have telephone or internet service at the location or they are working to control or stop the untreated discharge. Additional details regarding sewage overflows and incidents are required to be reported within 12 hours of discovery and available below.
| Facility Name | Town | Location Description | Receiving Waters | Date/Time Submission Entered |
|---|---|---|---|---|
| Rutland | Rutland | Permitted CSO Structures. Flow and volume data pending. Event still in progress. | Otter Creek & East Creek | 8/10/2016 7:01:32 AM |
| Rutland | Rutland | West Street Siphon Overflow. This is a permitted CSO structure used in high stormwater flow events. |
East Creek | 8/1/2016 8:10:49 AM |
| Shelburne 2 (Harbor Rd) | Shelburne | Falls Road at LaPlatte River bridge | LaPlatte River | 7/29/2016 4:11:40 PM |
| Rutland | Rutland | West Street Siphon. Approximate duration, less than 10 minutes with total discharge, less than 10,000 gallons. This is a permitted discharge from a CSO structure caused by a high sudden surge of stormwater. |
Otter Creek | 7/23/2016 6:13:42 PM |
| Shelburne 1 (Crown Rd) | Shelburne | Shelburne Bay | Lake Champlain | 7/20/2016 2:57:05 PM |
| Northfield | Northfield | East St. CSO-004 | Dog River | 7/19/2016 7:26:59 AM |
| Rutland | Rutland | Permitted CSO Structure, West Street Siphon. Flow and volume data pending, event still in progress. | East Creek | 7/14/2016 5:39:37 PM |
| Burlington Main | Burlington | Cso overflow | Pine street barge canal | 7/14/2016 3:30:30 PM |
| Burlington Main | Burlington | CSO overflow. | Intervals wetlands | 7/14/2016 3:20:16 PM |
|
NEWLY REPORTED OVERFLOWS. These overflows are pending review from DEC Wastewater staff
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
WET WEATHER COMBINED SEWER OVERFLOWS Reviewed by DEC Wastewater staff
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
ALL OTHER OVERFLOWS Reviewed by DEC Wastewater staff
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Source: Vermont Watershed Management in DEC at ANR 8.11.2016
